Problem 1
Which combination gives the production quantities that maximize profit under linear programming and the resulting profit?
View explanation
The objective is 5x + 4y in units of 10,000 yen. Solving 2x + y = 10 and x + 2y = 8 gives the intersection x = 4 and y = 2, with a profit of 280,000 yen. The other relevant vertices give 250,000 yen at (5,0) and 160,000 yen at (0,4), so the intersection is optimal. Producing only the product with the higher unit profit does not use the two capacities as profitably.
Problem 2
What is Q rounded to the nearest whole unit?
View explanation
Q = sqrt(2 × 3,600 × 2,000 / 500) = sqrt(28,800), or approximately 169.7, which rounds to 170 units. EOQ balances annual ordering cost, which falls as order size grows, against annual holding cost, which rises as order size grows.
Problem 3
What is the reorder point?
View explanation
Demand during lead time is 40 units per day × 5 days = 200 units. Adding 60 units of safety stock gives a reorder point of 260 units. Safety stock is held in addition to normal lead-time demand to absorb demand increases or replenishment delays.
Problem 4
Which combination correctly gives each plan's expected profit and the resulting choice?
View explanation
A's expected profit is 12 × 0.6 - 3 × 0.4 = 6.0 million yen. B's is 7 × 0.8 + 1 × 0.2 = 5.8 million yen. Under the stated expected-profit-only criterion, A is selected. The 3 million yen in A's unsuccessful outcome is a loss, so it is subtracted rather than added as a positive gain.
Problem 5
Which statement correctly gives the three-month and five-month forecasts and their response to this upward series?
View explanation
The three-month average is (140 + 160 + 180) / 3 = 160 units. The five-month average is (100 + 120 + 140 + 160 + 180) / 5 = 140 units. Because it excludes the older, lower observations, the shorter average responds more strongly to the recent rise. A shorter period also makes a forecast more responsive to temporary fluctuations.
Problem 6
What is next month's demand forecast?
View explanation
The forecast is 0.3 × 260 + 0.7 × 200 = 78 + 140 = 218 units. Alpha is the weight on the new actual value, so a value near zero preserves more of the prior forecast, while a value near one reacts more strongly to the latest actual result.
Problem 7
Which combination gives the utilization and daily operating time estimated by work sampling?
View explanation
Estimated utilization is 640 / 800 = 0.8, or 80%. Estimated operating time is therefore 480 × 0.8 = 384 minutes. Work sampling estimates the overall time composition from the proportions of random instantaneous observations; it does not convert the number of observations directly into minutes.
Problem 8
Which set of causes should be selected?
View explanation
A and B total 65 defects, or 65%. Adding C brings the cumulative total to 80 defects, or 80%, so A, B, and C are the smallest qualifying set. Including D also exceeds 80%, but it does not meet the requirement to use the fewest categories.
Problem 9
Which combination correctly gives gross profit, operating profit, and ordinary profit?
View explanation
Gross profit is 100 - 60 = 40 million yen. Operating profit is 40 - 25 = 15 million yen. Ordinary profit is 15 + 4 - 2 = 17 million yen. Non-operating income and expenses enter when ordinary profit is calculated, not when operating profit is calculated.
Problem 10
Which combination correctly gives the current ratio and ROA?
View explanation
The current ratio is 48 / 32 × 100 = 150%, and ROA is 6 / 50 × 100 = 12%. The current ratio uses current liabilities as its denominator to indicate short-term payment capacity. ROA uses average total assets as specified here to indicate the profitability of assets employed.
Result
More sets in this exam
- Fundamental Information Technology Engineer Examination (FE) | Section A Theory and Algorithms
- Fundamental Information Technology Engineer Examination (FE) | Subject A Applied Fundamentals, Probability, Statistics, and Information Theory Problems 02
- Fundamental Information Technology Engineer Examination (FE) | Section A Comprehensive Mock Test 01
- Fundamental Information Technology Engineer Examination (FE) | Subject A Computer Architecture, OS, and Reliability Questions 01
- Fundamental Information Technology Engineer Examination (FE) | Subject A Data Structures and Algorithms Questions 01
- Fundamental Information Technology Engineer Examination (FE) | Subject A Network and Database Questions 01